1st Geothermal Power Plant in WA to Go on Stream in Iran

TEHRAN (Tasnim) – The first geothermal power plant of West Asia, with a production capacity of 5-megawatt of electricity, will come on stream in Meshginshahr, Iran’s Ardabil province, by the end of the current Iranian calendar year (to end March 20, 2025).

1st Geothermal Power Plant in WA to Go on Stream in Iran

TEHRAN (Tasnim) – The first geothermal power plant of West Asia, with a production capacity of 5-megawatt of electricity, will come on stream in Meshginshahr, Iran’s Ardabil province, by the end of the current Iranian calendar year (to end March 20, 2025).

News ID: 73009743